Quick Ship

The most options & quality seating at quick ship in the contract furniture industry.

Quick Ship

At Via Seating, we don’t just have a quick ship program—we’re a quick ship company. Over 95% of our offerings are quick ship. Compare Via Seating lead times with other quick-ship programs and you’ll find we offer the greatest selection of quality seating with the broadest range of options. And we have always been that way. When we opened our doors in 1987, we introduced a new concept to the contract furniture industry. We launched our 48-hour manufacturing time and we did it on every chair, every fabric & every leather.

Read More About Us »

The Process

While our quick ship process is customized & not prescribed, the following shows the typical timeline of an approved project being handled on a quick ship schedule. Our dedicated project experts work hand-in-hand with you every step of the way to achieve your project deadlines.

1 day to process your order

1 day to process your order

Includes series with quick ship schedules using approved, in-stock fabrics & textiles. Processed on working business days by noon pacific time.
48-hours (2 days) to build it

48-hours (2 days) to build it

Number of products produced are based on the series, model or option 48-Hour Manufacturing schedules outlined below.
1 day to process & ship it out

1 day to process & ship it out

Products are processed and shipped out on working business days. Quick ship does not include the delivery time (ie. once the truck(s) have left our facility).

48-Hour Manufacturing Time

Version: 1.0
Published: 01/01/1987

This 48-Hour Manufacturing Time Statement is provided to you by VIA, Inc. (hereafter referred to as “Via Seating”, “we”, “us”, “our”).

The majority of Via Seating products using in-stock textiles are able to be produced within a 48-Hour Manufacturing Time. These schedules are outlined below per chair series, model & complex options. As we understand not all products are needed on quick ship, your ship or delivery date must be clearly included on your PO.

 

48-Hour Manufacturing Schedules

20/48 – 20 chairs produced in 48 hours.

4u mesh back, 4u groove back, Eclipse, Genie®, Genie Flex®, Onda, Rise, Riva, Run II, Spec Stools, Splash, Sutro, Terra, Vista II & Zee.

 

15/48 – 15 chairs produced in 48 hours.

4u upholstered back, Brisbane, Brisbane HD, Ballistic Brisbane & Terra.

 

10/48 – 10 chairs produced in 48 hours.

Carmel, Linate, Oslo, Proform®, Vero, upholstered backshells 20UPH, 22UBF & 22UBL.

 

5/48 – 5 chairs/benches/ottomans produced in 48 hours.

Chico, Edge, Luna, Carmel with executive diamond stitch & Proform® with executive diamond stitch, Vista II bariatric chairs.

 

2/48 – 2 chairs/modular pieces produced in 48 hours.

Astro, Comet, Meteor, Muir, Nebula, Orbit & all upholstered arms.

 

Important Details

 

What’s Not Included?

The following are not considered producible within a 48-Hour Manufacturing Schedule (ie. “Quick Ship”). Conditions where any of the following will move to a 48-Hour Manufacturing Schedule are noted with detail in this list.

Note, quick ship does not include delays from mills in supplying textiles or shipment time once the product ships out.

 

Not able to be produced on a 48-Hour Manufacturing Schedule:

 

Changes to This Statement

We may revise and update this statement from time to time at our sole discretion. All changes are effective immediately when we post them. If changes are material to this policy, we will make every effort to notify you before these amendments enter into force. Your continued use of the Via Seating Services means you accept and agree to any modifications to this statement.

 

Downloadable Documents

We offer a pdf download of the current & archived version of our Quick Ship Program Statement:

   –  48-Hour Manufacturing Time Statement v1 » (current version)

 

Contact Us

For any questions, please contact us at https://viaseating.com/contact-us/ ».

This statement was last modified on 09/30/2022.